Previous | Home | Next

4X6 timbers were placed on top of the concrete block piers. 2X6 floor joists on 12" centers were then laid on top of the 4X6s. A layer of 6 Mil visqueen was laid over the floor joists and 3/4" plywood nailed to them to form the floor.